2008 Nissan Quest - Automatic Transmission (Section AT) (297 pages)

Model: 2008 Nissan Quest
File size: 7.37 MB
Pages: 297 pages



Download Automatic Transmission (Section AT)

Manual Description
How To Perform Trouble Diagnosis Quick, (SRS) "AIR BAG" and "SEAT BELT PRE-TENSIONER" 7, precaution for On Board Diagnosis (OBD) System, precaution for A/T Assembly TCM Replacement 7.

Wiring Diagram - AT - CAN78, dTC VEHICLE SPEED SENSOR MTR 80, oBD-II Function A/T System 36, one or Two Trip Detection Logic OBD-II 36.

OBD-II Diagnostic Trouble Code (DTC) 36, dTC CAN COMMUNICATION LINE 77, wiring Diagram - AT - PNP/SW 84, wiring Diagram - AT - 1STSIG 109.

DTC A/T 2ND GEAR FUNCTION 111, wiring Diagram - AT - 2NDSIG 113, dTC A/T FLUID TEMPERATURE SENSOR CIRCUIT 88, wiring Diagram - AT - FTS 89.

Wiring Diagram - AT - FTSP 94, dTC TURBINE REVOLUTION SENSOR CIRCUIT 98, wiring Diagram - AT - TRSC 99, dTC A/T 3RD GEAR FUNCTION 116.

Wiring Diagram - AT - 3RDSIG 117, dTC A/T 4TH GEAR FUNCTION 120, wiring Diagram - AT - 4THSIG 121, dTC A/T 5TH GEAR FUNCTION 123.

Wiring Diagram - AT - 5THSIG 124, wiring Diagram - AT - TCCSIG 128, dTC VEHICLE SPEED SENSOR A/T, wiring Diagram - AT - VSSATC103.

DTC PRESSURE CONTROL SOLENOID VALVE A (LINE PRESSURE) 130, wiring Diagram - AT - PC/A 131, dTC ENGINE SPEED INPUT CIRCUIT, dTC SHIFT SOLENOID VALVE A 135.

DTC A/T 1ST GEAR FUNCTION 108, wiring Diagram - AT - SSV/A 136, wiring Diagram - AT - SFTFNC 171, dTC SHIFT SOLENOID VALVE B 140.

Wiring Diagram - AT - SSV/B 141, dTC PRESSURE CONTROL SOLENOID VALVE C (TCC AND SHIFT PRESSURE) 174, wiring Diagram - AT - PC/C 175, dTC SHIFT SOLENOID VALVE C 145.

Wiring Diagram - AT - SSV/C 146, dTC PRESSURE CONTROL SOLENOID VALVE C STUCK ON 179, wiring Diagram - AT - PC/CS 180, dTC SHIFT SOLENOID VALVE C.

Wiring Diagram - AT - SSV/CS 151, dTC LEVER SWITCH CIRCUIT 184, wiring Diagram - AT - LVRSW 185, dTC SHIFT SOLENOID VALVE D 155.

Wiring Diagram - AT - SSV/D 156, wiring Diagram - AT - PWR/IN 189, dTC ELECTRIC THROTTLE CONTROL SYSTEM 192, dTC PRESSURE CONTROL SOLENOID VALVE B (SHIFT PRESSURE) 165.

Wiring Diagram - AT - PC/B 166, o/D OFF Indicator Lamp Does Not Come On 193, engine Cannot Be Started in "P" "N" Position 194.