2014 Nissan Murano - Engine L System (Section Lu) (17 pages)

Model: 2014 Nissan Murano
File size: 0.56 MB
Pages: 17 pages



Download Engine L System (Section Lu)

Manual Description
Precautions for Removing Battery Terminal 4, remove old liquid gasket adhering to the liquid gasket application surface mating surface, remove liquid gasket completely from the liquid gasket application surface, mounting bolts, bolt, wipe the liquid gasket application surface and the mating surface with white gasoline (lighting heating.

Use) to remove adhering moisture, grease foreign materials, apply liquid gasket to the liquid gasket application surface, use Genuine RTV Silicone Sealant or equivalent, within minutes of liquid gasket application, install mating component.

If liquid gasket protrudes, wipe it off immediately, never retighten mounting bolts or nuts after installation, after minutes or more have passed from the installation, fill engine oil engine coolant, precautions for Removing Battery Terminal.

When removing the 12V battery terminal, turn OFF ignition, switch and wait least 30 seconds, stops, then a DTC detection error or ECU data corruption may, for vehicles with the 2-batteries, be sure to connect the main battery and the sub battery before turning ON ignition switch.

If the ignition switch is turned ON with any one terminals, main battery and sub battery disconnected, then DTC may be, after installing the 12V battery, always check "Self Diagnosis Result" of all ECUs erase DTC, the removal of 12V battery may cause DTC detection error.

Before starting work, check no fire or spark producing items are work area, release fuel pressure before disconnecting disassembly, after disconnecting pipes, plug openings stop fuel leakage, drain engine coolant and engine oil when engine cooled.

Before repairing or replacing, thoroughly inspect parts, when instructed to use SST, use specified tools, exercise maximum care to avoid damage to mating sliding surfaces, dowel pins are used for several parts alignment.

Check that dowel pins are installed original position, must cover openings of engine system with a tape or equivalent, to seal out foreign materials, mark and arrange disassembly parts in an organized way for easy troubleshooting reassembly, when loosening nuts and bolts, as a basic rule, start with the one furthest outside, then one diagonally.

Use torque wrench to tighten bolts nuts specification, when tightening nuts and bolts, as a basic rule, equally tighten in several different steps starting with, ones in center, then ones on inside and outside diagonally in this order, replace with new gasket, packing, oil seal O-ring.

Thoroughly wash, clean, and air-blow each part, avoid damaging sliding or mating surfaces, before assembly, oil sliding surfaces well, after disassembling, or exposing any internal engine parts, change engine oil and replace oil filter with new.

Release air within route when refilling after draining engine coolant, after repairing, start the engine and increase engine speed to check engine coolant, fuel, engine oil, the actual shapes of Kent-Moore tools may differ from those of special service tools illustrated here, maximum measuring range: 2,452 kPa (25.

Adapting oil pressure gauge oil pan (upper), pressing the tube liquid gasket, removing and installing oil pressure switch, before starting engine, put vehicle horizontally and check the engine oil level.

It and allow 10 minutes before checking, check engine oil for white turbidity heavy contamination, if engine oil becomes turbid and white, it is highly probable that it is contaminated with engine coolant, check for engine oil leakage around following areas.

Valve timing control covers (bank 1 bank 2), intake valve timing control solenoid valve (bank 1 bank 2), mating surface between cylinder head rocker cover.